Denitrification – BioRemove 5900

A 1.1 MGD municipal wastewater plant was experiencing erratic denitrification efficiency ranging from 95 to 77% removal over a 30 day period.  BioRemove 5900 was added and over a 10 day period efficiency steadily increased from 77% to above 90%.  With continued addition of BioRemove 5900 efficiency stayed between 90 and 95% for the next 45 days.